by DTP Bouygues Construction | Mar 19, 2025
Angovia Gold Mine First Contract Mining in a mine called now Yaoure in the middle of Cote d’Ivoire. KEY FIGURES 150 employees 9 million BCM per year 10% extraction with drill & blast 7 MUSD TO contract SCOPE OF WORKS Load and haul Drill and blast EQUIPMENT ...
by DTP Bouygues Construction | Mar 4, 2025
Geita Gold Mine Following on from the operation of the Morila goldmine and with the confidence of our Client, we worked on the Loulo gold mine, located not far from the Gounkoto site, from 2009 to 2012. This mine was a brownfield operation taking over from a previous...
by DTP Bouygues Construction | Mar 4, 2025
Loulo Gold Mine Following on from the operation of the Morila goldmine and with the confidence of our Client, we worked on the Loulo gold mine, located not far from the Gounkoto site, from 2009 to 2012. KEY FIGURES More than 250 employees 5 million BCM per year 30%...
by DTP Bouygues Construction | Mar 4, 2025
Morila Push Back Gold Mine DTP first operated the Morila goldmine between 2000 and 2009. Then the recovery and treatment at this same site of 18 MBCM of ore stores with a low gold content between 2009 and 2013. DTP also worked on the Morila Push Back project...
by DTP Bouygues Construction | Mar 4, 2025
Morila Gold Mine DTP operated the Morila goldmine between 2000 and 2009. This single pit operation produced 6.9 million onces of gold and is the first DTP’s operation in Mali. KEY FIGURES More than 550 employees 9 million BCM per year Extraction of more than 80...