Morila Push Back Gold Mine
DTP first operated the Morila goldmine between 2000 and 2009. Then the recovery and treatment at this same site of 18 MBCM of ore stores with a low gold content between 2009 and 2013. DTP also worked on the Morila Push Back project (extension of the mine) over a period of 23 months (2013-2015) concerning the extraction of 10 MBCM.
KEY FIGURES
- More than 400 employees
- 10 million BCM per year
- Extraction of more than 110 million BCM
SCOPE OF WORKS
- Drill and Blast
- Load & Haul
EQUIPMENT
- 6 Drills / Atlas Copco DM 30
- 2 Excavators / Liebherr 9250
- 1 Excavator / Liebherr 994
- 8 Trucks / CAT 777G
Location
Republic of Mali, West Africa
Duration
2013 – 2016
client
Randgold Resources / Barrick Gold