Gounkoto Gold Mine

As an exclusive subcontractor of Barrick, we have been responsible for mining and extraction work at the Gounkoto gold mine in Mali since 2011. Having operated in Mali since 2000, DTP Mining was previously responsible for the Morila gold mine and its extensions and the Loulo gold mine.

KEY FIGURES 

 

  • More than 600 employees
  • 14 million BCM per years
  • Total extraction of more than 180 million BCM @ 1:8 strip ratio
  • ~780M USD Turn Over contract

SCOPE OF WORKS 

 

  • Load and haul
  • Drill and blast
  • Dewatering
  • Crusher Feed

EQUIPMENT

 

  • 8 Drills / Epiroc D65 and D60
  • 3 Excavators / Liebherr 9350 – 350 tonnes
  • 3 Excavator / Liebherr 9200 – 200 tonnes
  • 2 Loaders / CAT 992 & 988
  • 30 Trucks / KOMATSU 785 and CAT 777D– payload of 102 and 92 tonnes respectively
  • 10 Dozers / CAT D 9R

Location

Republic of Mali, West Africa

Duration

July 2011 – December 2028 (estimated end date)

client

Randgold Resources / Barrick